Sylhet Surma River, Chatak Bridge River Crossing Tower With Transmission Lines

Confidence Infrastructure is engaged in the construction of a River Crossing Tower with 33 kV Transmission Line (Double Circuit). This comprehensive project encompasses various stages, including survey, design, supply, carrying, erection, testing, and commissioning. In addition to the construction of the tower, the company is responsible for undertaking civil works and other related activities over the Surma River near Chatak Bridge. This significant endeavor is part of the Power Distribution System Development Project in the Sylhet Division, overseen by BPDB (Bangladesh Power Development Board) in Sylhet, and is being executed on a turnkey basis by Confidence Infrastructure.