Power transmission line from Payra power plant to Gopalganj substation (New) was built by GS E&C (Korea). And Confidence Infrastructure Ltd. has supplied approx. 28,000 MT 400kV double circuit transmission tower to construct 170 km transmission line for this project as the tower manufacturer.